IS5803 Pre Course Asst Week-1

  1. IT professionals recognize that successful systems must be user-oriented, and users need to be
    involved, formally or informally, at every stage of system development.
    Ans: True
  2. The database and the Internet speak the same language.
    Ans: False
  3. An evaluation model is a technique that uses a common yardstick to measure and
    compare vendor ratings
    Ans: True
  4. Tools make it easier to build an information system, thereby boosting IT productivity
    and improving the quality of the finished product.
    Ans: True
  5. Using flowcharts, programmers can break large systems into subsystems that are easier
    to understand and code.
    Ans: True
  6. In an efficient design, data is re entered at least two times.
    Ans: False
  7. A main advantage of ERP is that it describes a specific hardware and software
    environment, also called a platform, which ensures connectivity and easy integration of
    future systems, including in-house software and commercial packages
    Ans: True
  8. Today’s mobile devices have enough computing power to provide processing “at the
    edge,” which means at the end of a network, in the user’s hands.
    Ans: True
  9. Internal and external factors affect every business decision that a company makes, and
    IT systems are no exception.
    Ans: True
  10. Using a work breakdown structure (WBS) allows one to manage a project as one large
    task.
    Ans: False
  11. When network traffic is encrypted, it is invisible and its content and purpose are
    masked.
    Ans: False
  12. A use case represents the steps in a specific business function or process.
    Ans: True
  13. In the systems design phase, a logical model is built that describes how the system will
    be constructed.
    Ans: False
  14. _ is a systems development technique that produces a graphical
    representation of a
    concept or process that systems developers can analyze, test, and modify.
    Ans: Modeling
  15. Structured application development usually involves a(n) _, which
    proceeds from a general design to a detailed structure.
    Ans: Top-down approach
  16. If processes must be performed in a specific sequence, the information should
    be documented in the _.
    Ans: Process descriptions
  17. _ is the amount of data that can be transferred in a fixed time period.
    Ans: Bandwidth
  18. A(n) _ produces one or more lines of output for each record processed.
    Ans: Detail report
  19. The first step in managing IT security is to develop a _ based on
    confidentiality, integrity, and availability.
    Ans: Security policy
  20. A common tool for showing the distribution of a questionnaire or sampling
    results is a vertical bar chart called a _.
    Ans: Histogram
  21. A software package developed to handle information requirements for a specific type of business is called a(n) _.
    Ans: Vertical application
  22. Which is an example of a discretionary project?
    Ans: Creating a new report for a user
  23. A _ is a set of letters or numbers that represents a data item.
    Ans: Code
  24. An object’s _ are the tasks or functions that the object performs when it
    receives a command to do so.
    Ans: Methods
  25. A _ consists of horizontal bars, connected with arrows that indicate task
    dependencies.
    Ans: Gantt chart

Other Links:

Statistics Quiz

Networking Quiz

See other websites for quiz:

Check on QUIZLET

Check on CHEGG

Leave a Reply

Your email address will not be published. Required fields are marked *