A _______ is an arrangement of parts or elements that together exhibit behaviour or meaning that the individual constituents do not.(6)
SYSTEM
SE Managers must first develop the project Systems Engineering ______ plan(10)
MANAGEMENT
The systems engineer is the primary_______ between management, customers, suppliers, and specialty engineers in the systems development process.(9)
INTERFACE
The ________ approach has long been used in systems engineering and usually involves either interdisciplinary (e.g. integrated product teams) or multi-disciplinary (e.g. joint technical reviews) methods.(11)
INTEGRATIVE
The term _______ is derived from the Latin ingenium, meaning “cleverness” and ingeniare, meaning “to contrive, devise”.(11)
ENGINEERING
The first V in “VV” stands for:(10)
VALIDATION
________ is intended to mean a large undertaking, especially one of large scope, complication and risk(10)
ENTERPRISE
The retirement of a system happens when the system has reached the end of its useful _____(4)
LIFE
An _________ system is a system designed or adapted to interact with an anticipated operational environment to achieve one or more intended purposes while complying with applicable constraints.(10)
ENGINEERED